Listen in as Mayor Costin and Planning and Engineering Director Gary Oakes explain the various utility projects happening right now. While causing inconveniences now, we can see the light at the end of the tunnel. The mayor also discusses the upcoming installation of dry wells in the Duo Drive area and how it will alleviate some of the flash flooding experienced in the area. Gary Oakes talks briefly about the levee, as well.

https://youtu.be/mdAOx_tZvGI